Global InfoMine Home Page
Home News Companies Countries Suppliers Careers Library Maps Software
Investment Commodities Properties Equipment Consultants EduMine Technology Events Mineweb
Blogs Mine Sites Mine Costs About Contact eStore Advertise Subscribe MINING.com
 

Coal Cost Guide Cost Indexes for Surface and Underground Coal Mining and Processing (Preparation)

The Cost Data and Advice You Need to Make Informed Mining Decisions

Coal Cost Guide Cost Indexes for Surface and Underground Coal Mining and Processing (Preparation)

Cost indexes provide a means of adjusting out-dated cost information for the effects of inflation. They are based on statistical averages of costs for specific items and time periods. Following are the composite indexes for capital and operating costs for each of surface and underground coal mining and coal processing (preparation) operations. Indexes for specific cost centers, e.g. labor, equipment, transportation, fuel, explosives, tires, electric power, natural gas, and industrial chemicals are available by subscription to Coal Cost Guide.

The CostMine U.S. CCG indexes are composite indexes representing the cost of developing and operating a typical coal mine and preparation plant operation in the United States. Separate indexes are listed for surface mine capital costs, surface mine operating costs, underground mine capital costs, underground mine operating costs, mill capital costs, and mill operating costs. Composite proportions are determined from base model estimates with cost distributions listed in Coal Cost Guide (printed version). The surface mine base model is a typical truck-dragline-excavator operation mining 45,000 short tons (40,800 tonnes) coal per day. The underground mine base model is a 8,000 short tons (7,258 tonnes) per day longwall operation using using continuous miner development and ramp access and LHD-conveyor haulage. The plant base model is a 1,400 short tons (1,270 tonnes) per hour heavy media operation.

Coal Cost Guide (CCG) Indexes for USA
Surface MineUnderground MineProcessing/Preparation
YearMonthCapital Cost IndexOperating Cost IndexCapital Cost IndexOperating Cost IndexCapital Cost IndexOperating Cost Index
2007 Jan 112 114.1 113.1 112.5 112.3 116
2007 Feb 112.4 115.6 113.5 113.3 113.1 116.8
2007 Mar 112.9 117.2 113.6 113.2 114 116.6
2007 Apr 113.4 119.1 114.7 114.8 115.3 117.8
2007 May 113.4 118.6 114.9 115.5 116 119.8
2007 June 113.5 119.1 115.3 116.5 116.6 121.4
2007 Jul 114.2 120.6 115.6 117 117.2 122.5
2007 Aug 114.1 120.3 116.2 117.6 117.1 121.8
2007 Sep 114.7 122 116.4 118.1 117.5 123.4
2007 Oct 114.8 121.7 116 116.8 117.3 123
2007 Nov 115.7 125.6 116.1 117.2 118 125.5
2007 Dec 115.5 123.9 116.2 117.4 118.2 124.9
 
2008 Jan 115.9 125 116.9 118.4 118.8 126.5
2008 Feb 116.7 126.9 119.3 120.2 120 127.3
2008 Mar 118.1 132.8 119.9 121.7 121.2 130.2
2008 Apr 118.9 134.2 121.8 123.7 123.1 132.3
2008 May 119.6 137.4 123.9 125.9 125.8 135.3
2008 June 120.9 140.3 125.2 127.5 127.3 137.6
2008 Jul 121.5 141.6 125.6 127.9 129.4 140.6
2008 Aug 120.5 136.9 127 130.4 130.6 140.2
2008 Sep 120.8 137.7 128.1 130.3 130.5 140.9
2008 Oct 120.3 135.7 127.6 129.3 127.8 135.6
2008 Nov 119.5 131.7 129 126.9 124.9 130.4
2008 Dec 118.7 127.4 126.4 126.6 123.9 127.9
 
2009 Jan 120.7 127.3 128.9 126.8 123.3 128.4
2009 Feb 120.5 125.6 128.6 125.4 122.5 127.3
2009 Mar 120.2 124 127.9 124 121.9 126.9

Order Form »