Hide this alert
InfoMine Home

Industry Standard for Mining Cost Estimating

Gold Heap Leach Cost Estimating Guide

Key reference to costs for Leach Pad and Pond Construction, Site Preparation, Gold Recovery and Reclamation.

Summary

The Gold Heap Leach Cost Estimating Guide is designed to bring all of the pertinent costs for gold heap leaching into one handy reference.

The Guide provides estimators, engineers, investors and accounting professionals cost estimating models for mining, heap construction and placing, gold recovery and reclamation.

  • The Guide provides current costs for today's mining methods and heap leach processing technologies across a wide range of production rates.
  • It surveys the variety of operating conditions world-wide along with their reserve base and addresses methods in use to reduce costs and increase the rate of recovery for gold.
  • The Guide provides costs for the most common methods of processing in use today including carbon adsorption and Merrill-Crowe zinc recovery methods and the ROM and CSA pre-leach options.
  • Several papers address special topics consisting of leach pad construction alternatives, re-contouring for reclamation, heap leach closure, equipment leasing, costs of cyanide consumption and agglomeration, cost indexes for adjusting costing estimates and more.
  • It complements other InfoMine cost estimating software and publications.

Ask Our Experts

Since 1983, we have been providing services and data to the mining industry. Our highly experienced staff consists of registered professional mining engineers, geologists, and equipment estimators. Our specialties include project evaluation, cost estimating, third party review and expert witness services. This group forms a strong working team built on a solid background, drawing from experience in mine engineering, mineral economics, project evaluation, mine operation, exploration and government service.

While our capabilities and experience cover a broad spectrum of mining and geologic areas, we are especially proud of the reputation we have attained in the areas of cost estimating and economic analysis.

Call or Email Us Today

Telephone + 1 509 328 8023

Table of Contents

Introduction
  • Heap Leach Operations for Gold, World-wide (Reserve base, Production, Evolution in Processing)
  • Technologies to Reduce Cost and Increase Recovery
  • 11 X 17 Map includes 322 mines, properties and proposed projects
Cost Models
  • Model 1 - Gold Heap Leach Surface Mine Models
  • Model 2 - Leach Pad and Pond Construction Models
  • Model 3 - Heap Leach Pad Loading Models
  • Model 4 - Gold Heap Leach Adsorption/Desorption Plant Models
  • Model 5 - Gold Heap Leach Merrill-Crowe Plant Models
Special Papers
  • Paper 1 - Leach Pad Construction Estimating
  • Paper 2 - The Cost of Site Preparation
  • Paper 3 - The Costs of Geomorphic Reclamation Practices
  • Paper 4 - Engineered Cost Estimates for Closing Heap Leach Facilities
  • Paper 5 - Costs For Passive Water Treatment of Haul Road Runoff
  • Paper 6 - Estimating Costs of Agglomeration in Gold Heap Leaching
  • Paper 7 - Estimating Costs of Cyanide Consumption for Gold Heap Leach
Gold Heap Leach Cost Indexes and Metal Prices - United States
Additional topics
  • Improving gold recovery at leach operations
  • Practices to reduce costs
  • Heap leach dynamic simulation technology
  • Use of SART (sulfidization-acidification-recovery technology) to reduce cyanide consumption
  • Raincoats in wet climates
  • Expansion of heap leach to old tailings

Contact us:

Phone: +1 (509) 328-8023
Email: info@costmine.com